Case Studies

In this curated collection, we present a diverse array of case studies that showcase our expertise in a wide range of solutions, and providing innovative solutions for a variety of construction and infrastructure projects.

Each case study offers a detailed exploration of the geotechnical issues faced, the methodologies employed, and the successful outcomes achieved. From foundation design, water wells to ground improvement and environmental considerations. Our case studies demonstrate the comprehensive approach we take in addressing the multifaceted aspects of geotechnical engineering.

Explore the projects that exemplify our dedication to delivering reliable, sustainable, and cost-effective solutions that stand the test of time.

Phase I Environmental Desk Study at Temple Newsam Park

Phase I Environmental Desk Study at Temple Newsam Park

GeoEnviro Solutions Ltd was appointed to conduct a Phase I Environmental Site Investigation for renovating and expanding existing roads, footpaths, and areas within Temple Newsam Park and the adjoining golf course.

Helical Screw Pile Installation

Helical Screw Pile Installation for Telecommunications Infrastructure

GeoEnviro Solutions installed AB Chance helical screw piles for telecommunications infrastructure, providing versatile, fast, and cost-effective foundation solutions.

Advanced Site Investigation for Retaining Wall Design and Slope Stability at Coombe Farm

Advanced Site Investigation for Retaining Wall Design and Slope Stability at Coombe Farm

GeoEnviro Solutions conducted site investigation for retaining wall design and slope stability at Coombe Farm, ensuring safety for residential redevelopment.

Belvoir-Ironworks-Case-Study Site investigation

Comprehensive Site Investigation for Belvoir Ironworks

Our site investigation specialists company was engaged to conduct a detailed site investigation for the Belvoir Ironworks redevelopment. The project faced several obstacles due to severe winter weather, which left large portions of the site waterlogged and inaccessible.

Ground Investigation at Malvern Rail Link

Precision Ground Investigation at Malvern Rail Link

Our site investigation specialists were engaged to conduct a detailed ground investigation for the Malvern Rail Link, overcoming access challenges by working nights to support rail infrastructure development.

Renewable Heating System Installation at Morecambe Bay Academy

Renewable Heating System Installation at Morecambe Bay Academy

Morecambe Bay Academy faced a major heating issue when their ageing and inefficient gas boilers failed completely. GeoEnviro Solutions Ltd to develop a more efficient and environmentally friendly heating system.

Site Investigation at National Grid High Voltage Substations

Site Investigation at National Grid High Voltage Substations

Engaged to conduct a detailed assessment at a National Grid substation, our site investigation specialists navigated restricted access and upheld strict high-voltage safety protocols.